NHON HOI 9 URBAN ECOTOURISM

NHON HOI 9 URBAN ECOTOURISM


 
  1. Surface area: 168.200m2
  1. Construction detail
  • The road system
  • Rain drainage system
  • Sewerage system
  • Utility trench
  • Green trees
  • Electric lighting
  • Electric supply
  • Water supply
  • Information system
  • Sports equipment in the park
  1. Construciton time: From 25/12/2019 to 29/04/2020

Construciton time:

 
 































 
 































 

Other Projects