NHON HOI 9 URBAN ECOTOURISM
- Surface area: 168.200m2
- Construction detail
- The road system
- Rain drainage system
- Sewerage system
- Utility trench
- Green trees
- Electric lighting
- Electric supply
- Water supply
- Information system
- Sports equipment in the park
- Construciton time: From 25/12/2019 to 29/04/2020
Construciton time:
Other Projects